Skip to content

Project details

"Provision of multidisciplinary consultancy services from concept to construction for a 122 hectare multi-use new development fulfilling local authority identified housing needs."

Client:
GS Brown Construction

Sector:
Residential, business, commercial, education

Cost:
£125m

Project description

Millard Consulting have had the pleasure of long involvement with developer G S Brown Construction on the Oudenarde project at Bridge of Earn since its inception in 1999. Following a review of housing land in the Perth Area, a substantial need for new housing was identified and the land comprising the former Bridge of Earn Hospital and adjacent arable farmland was earmarked as a potential development site.

The now approved masterplan for the 122 hectare Oudenarde site allows for the construction of up to 1500 houses, together with business facilities, a petrol filling station, hotel, park and ride site, rail halt, a primary school and new village centre facilities.

Situated to the East of the Bridge of Earn, the development will double the size of the existing settlement. Millard Consulting provided strategic support with expert witness evidence leading to success at a public inquiry. We have since provided principal assessment, engineering and design services for:

  • transport planning
  • infrastructure
  • flood risk
  • topographical surveys
  • highway and drainage
  • service diversions
  • environmental engineering
  • ground investigation

Check out the link on the Perth and Kinross website:-

http://www.pkc.gov.uk/CHttpHandler.ashx?id=3642

Back To Top